tp-20260728-173408

Scanned

20731
Offers
10
Routes
0
Errors
production
Env
roundtrip
Trip
TP
Carrier

What this run found

40 trips had an Amadeus offer. For each, this is what NDC quoted for the same itinerary.

Route BOS–DXB · trip a route on exact dates, what a search asks for · itinerary the exact flight combination that gets ticketed, e.g. EK238 / EK237. Tables below say which of the three they compare. Hover a flight code for its departure time.

Per trip: Amadeus's cheapest itinerary vs NDCtrip

One row per trip, anchored on the itinerary Amadeus was cheapest on — what a price-driven agent would have booked. Shows what NDC quoted for those same flights. Every trip appears, including the ones NDC won: they are what the rest are measured against

origindestinationdeparture_datereturn_dateflight_codesreasonoperated_byamadeus_netndc_netdeltapct_diffndc_best_net
EWR FNC 2026-08-25 2026-09-08 TP212-TP1933-TP1685 / TP1694-TP201 NDC missing this itinerary TP,NI 939.03 — — — 1059.73
EWR FNC 2026-09-22 2026-10-11 TP212-TP1705 / TP1696-TP1920-TP211 NDC missing this itinerary TP 695.53 — — — 721.73
BOS LIS 2026-08-25 2026-09-08 TP216 / TP217 Same price TP 718.83 718.83 0 0 718.83
BOS LIS 2026-09-08 2026-09-24 TP216 / TP215 Same price TP 748.83 748.83 0 0 748.83
BOS LIS 2026-09-22 2026-10-11 TP218 / TP217 Same price TP 813.83 813.83 0 0 813.83
BOS LIS 2026-10-06 2026-10-27 TP218 / TP217 Same price TP 793.83 793.83 0 0 793.83
BOS PDL 2026-08-25 2026-09-08 TP216-TP1861 / TP1864-TP217 Same price TP 729.23 729.23 0 0 663.33
BOS PDL 2026-09-08 2026-09-24 TP216-TP1861 / TP1860-TP215 Same price TP 686.23 686.23 0 0 686.23
BOS PDL 2026-09-22 2026-10-11 TP216-TP1861 / TP1866-TP217 Same price TP 751.23 751.23 0 0 751.23
BOS PDL 2026-10-06 2026-10-27 TP216-TP1861 / TP1866-TP217 Same price TP 731.23 731.23 0 0 731.23
EWR FNC 2026-09-08 2026-09-24 TP212-TP1703 / TP1702-TP211 Same price TP 683.73 683.73 0 0 683.73
EWR FNC 2026-10-06 2026-10-27 TP212-TP1703 / TP1704-TP211 Same price TP 653.73 653.73 0 0 653.73
EWR LIS 2026-08-25 2026-09-08 TP204 / TP1930-TP211 Same price TP 945.03 945.03 0 0 850.03
EWR LIS 2026-09-08 2026-09-24 TP202 / TP203 Same price TP 698.83 698.83 0 0 698.83
EWR LIS 2026-09-22 2026-10-11 TP212-TP1931 / TP1922-TP211 Same price TP 785.43 785.43 0 0 785.43
EWR LIS 2026-10-06 2026-10-27 TP204 / TP201 Same price TP 627.83 627.83 0 0 627.83
IAD LIS 2026-08-25 2026-09-08 TP234 / TP233 Same price TP 989.83 989.83 0 0 989.83
IAD LIS 2026-09-08 2026-09-24 TP234 / TP233 Same price TP 888.83 888.83 0 0 888.83
IAD LIS 2026-09-22 2026-10-11 TP234 / TP233 Same price TP 953.83 953.83 0 0 953.83
IAD LIS 2026-10-06 2026-10-27 TP234 / TP231 Same price TP 757.83 757.83 0 0 757.83
IAD OPO 2026-08-25 2026-09-08 TP234-TP1930 / TP1921-TP231 Same price TP 772.63 772.63 0 0 772.63
IAD OPO 2026-09-08 2026-09-24 TP234-TP3960 / TP3961-TP233 Same price TP,NI 745.63 745.63 0 0 745.63
IAD OPO 2026-09-22 2026-10-11 TP234-TP1930 / TP1921-TP231 Same price TP 688.63 688.63 0 0 688.63
IAD OPO 2026-10-06 2026-10-27 TP232-TP1920 / TP1921-TP231 Same price TP,NI 688.63 688.63 0 0 688.63
JFK LIS 2026-08-25 2026-09-08 TP210 / TP215-TP4315 Same price TP,B6 997.93 997.93 0 0 986.83
JFK LIS 2026-09-08 2026-09-24 TP210 / TP209 Same price TP 698.83 698.83 0 0 698.83
JFK LIS 2026-09-22 2026-10-11 TP210 / TP209 Same price TP 753.83 753.83 0 0 753.83
JFK LIS 2026-10-06 2026-10-27 TP210 / TP209 Same price TP 627.83 627.83 0 0 627.83
JFK OPO 2026-08-25 2026-09-08 TP210-TP1930 / TP1925-TP209 Same price TP 1038.63 1038.63 0 0 883.63
JFK OPO 2026-09-08 2026-09-24 TP210-TP1930 / TP3961-TP209 Same price TP 812.63 812.63 0 0 812.63
JFK OPO 2026-09-22 2026-10-11 TP210-TP1930 / TP1925-TP209 Same price TP 741.63 741.63 0 0 741.63
JFK OPO 2026-10-06 2026-10-27 TP210-TP1930 / TP1927-TP209 Same price TP,NI 741.63 741.63 0 0 741.63
MIA LIS 2026-08-25 2026-09-08 TP224 / TP223 Same price TP 934.83 934.83 0 0 934.83
MIA LIS 2026-09-08 2026-09-24 TP224 / TP223 Same price TP 755.83 755.83 0 0 755.83
MIA LIS 2026-09-22 2026-10-11 TP224 / TP225 Same price TP 651.83 651.83 0 0 651.83
MIA LIS 2026-10-06 2026-10-27 TP224 / TP223 Same price TP 626.83 626.83 0 0 626.83
SFO OPO 2026-08-25 2026-09-08 TP240-TP1828 / TP1935-TP237 Same price TP 909.83 909.83 0 0 909.83
SFO OPO 2026-09-08 2026-09-24 TP240-TP1828 / TP1939-TP237 Same price TP 854.83 854.83 0 0 854.83
SFO OPO 2026-09-22 2026-10-11 TP238-TP1930 / TP1935-TP237 Same price TP 938.63 938.63 0 0 938.63
SFO OPO 2026-10-06 2026-10-27 TP238-TP1930 / TP1935-TP237 Same price TP,NI 818.63 818.63 0 0 818.63

download this table as CSV

What decides the cheaper price

For itineraries both sources quoted: whether the cheaper net price comes from the fare or from the commission paid back — net price is the fare minus commission. The last column counts the wins that would reverse if commission were removed

driveritinerariesavg_net_gapflips_without_commission
same net price 1204 0 0
ndc wins on fare 210 69.68 0
ndc wins on commission 37 89.22 37
amadeus wins on commission 32 -54.17 32
amadeus wins on fare 6 -896.48 0

download this table as CSV

▶ Itinerary ledger 1489 itinerary Every itinerary quoted by both sources, priced side by side — the drill-down behind why-amadeus
origindestinationdeparture_datereturn_dateflight_codesnightsamadeus_netndc_netdeltapct_diffcheaper
IAD OPO 2026-09-08 2026-09-24 TP8505-TP212 / TP1925-TP233 16 1021.33 2035.83 -1014.5 -49.8 amadeus
IAD OPO 2026-09-08 2026-09-24 TP8505-TP212 / TP1923-TP233 16 1021.33 2035.83 -1014.5 -49.8 amadeus
IAD OPO 2026-09-08 2026-09-24 TP8505-TP212 / TP1939-TP233 16 1021.33 2035.83 -1014.5 -49.8 amadeus
IAD OPO 2026-09-08 2026-09-24 TP8505-TP212 / TP3961-TP233 16 1021.33 2035.83 -1014.5 -49.8 amadeus
IAD OPO 2026-09-08 2026-09-24 TP8505-TP212 / TP1921-TP233 16 1113.33 2035.83 -922.5 -45.3 amadeus
IAD OPO 2026-09-08 2026-09-24 TP8505-TP212 / TP211-TP8498 16 1716.43 2114.83 -398.4 -18.8 amadeus
IAD OPO 2026-09-22 2026-10-11 TP8507-TP212 / TP1925-TP233 19 2089.83 2198.33 -108.5 -4.9 amadeus
IAD OPO 2026-09-22 2026-10-11 TP8507-TP212 / TP1923-TP233 19 2089.83 2198.33 -108.5 -4.9 amadeus
IAD OPO 2026-09-22 2026-10-11 TP8507-TP212 / TP1921-TP233 19 2089.83 2198.33 -108.5 -4.9 amadeus
IAD OPO 2026-09-22 2026-10-11 TP8507-TP212 / TP1939-TP231 19 1948.53 2041.33 -92.8 -4.5 amadeus
IAD OPO 2026-09-22 2026-10-11 TP8507-TP212 / TP1941-TP231 19 1948.53 2041.33 -92.8 -4.5 amadeus
IAD OPO 2026-09-22 2026-10-11 TP8507-TP212 / TP1937-TP231 19 1948.53 2041.33 -92.8 -4.5 amadeus
IAD OPO 2026-09-22 2026-10-11 TP8507-TP212 / TP1921-TP231 19 1948.53 2041.33 -92.8 -4.5 amadeus
SFO OPO 2026-10-06 2026-10-27 TP238-TP1930 / TP211-TP8490 21 1668.63 1729.73 -61.1 -3.5 amadeus
SFO OPO 2026-10-06 2026-10-27 TP238-TP3960 / TP211-TP8490 21 1668.63 1729.73 -61.1 -3.5 amadeus
SFO OPO 2026-10-06 2026-10-27 TP238-TP1934 / TP211-TP8490 21 1668.63 1729.73 -61.1 -3.5 amadeus
SFO OPO 2026-10-06 2026-10-27 TP238-TP1932 / TP211-TP8490 21 1668.63 1729.73 -61.1 -3.5 amadeus
SFO OPO 2026-10-06 2026-10-27 TP238-TP1936 / TP211-TP8490 21 1668.63 1729.73 -61.1 -3.5 amadeus
BOS LIS 2026-08-25 2026-09-08 TP8513-TP204 / TP201-TP8514 14 1653.33 1713.43 -60.1 -3.5 amadeus
BOS LIS 2026-08-25 2026-09-08 TP8515-TP204 / TP201-TP8514 14 1653.33 1713.43 -60.1 -3.5 amadeus
MIA LIS 2026-08-25 2026-09-08 TP8591-TP212-TP1933 / TP201-TP8590 14 2853.13 2904.83 -51.7 -1.8 amadeus
MIA LIS 2026-08-25 2026-09-08 TP8591-TP212-TP1935 / TP201-TP8590 14 2853.13 2904.83 -51.7 -1.8 amadeus
MIA LIS 2026-08-25 2026-09-08 TP8591-TP212-TP1931 / TP201-TP8590 14 2853.13 2904.83 -51.7 -1.8 amadeus
BOS LIS 2026-08-25 2026-09-08 TP4313-TP210 / TP201-TP8514 14 1548.03 1596.43 -48.4 -3 amadeus
BOS LIS 2026-08-25 2026-09-08 TP8513-TP204 / TP209-TP4468 14 1527.33 1573.43 -46.1 -2.9 amadeus
BOS LIS 2026-08-25 2026-09-08 TP8515-TP204 / TP209-TP4468 14 1527.33 1573.43 -46.1 -2.9 amadeus
BOS LIS 2026-08-25 2026-09-08 TP216 / TP201-TP8514 14 1453.53 1491.93 -38.4 -2.6 amadeus
BOS LIS 2026-08-25 2026-09-08 TP4313-TP210 / TP209-TP4468 14 1422.03 1456.43 -34.4 -2.4 amadeus
BOS LIS 2026-08-25 2026-09-08 TP4315-TP210 / TP209-TP4468 14 1422.03 1456.43 -34.4 -2.4 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8513-TP204 / TP215 19 1332.73 1358.33 -25.6 -1.9 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8515-TP204 / TP215 19 1332.73 1358.33 -25.6 -1.9 amadeus
BOS LIS 2026-08-25 2026-09-08 TP216 / TP209-TP4468 14 1327.53 1351.93 -24.4 -1.8 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8515-TP204 / TP217 19 1301.23 1323.33 -22.1 -1.7 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8513-TP204 / TP1922-TP227 19 1311.43 1333.53 -22.1 -1.7 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8513-TP204 / TP217 19 1301.23 1323.33 -22.1 -1.7 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8513-TP204 / TP1920-TP227 19 1311.43 1333.53 -22.1 -1.7 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8515-TP204 / TP1922-TP227 19 1311.43 1333.53 -22.1 -1.7 amadeus
BOS LIS 2026-09-22 2026-10-11 TP8515-TP204 / TP1920-TP227 19 1311.43 1333.53 -22.1 -1.7 amadeus
JFK LIS 2026-09-08 2026-09-24 TP4304-TP216 / TP215-TP4315 16 984.43 984.43 0 0 tie
JFK LIS 2026-09-08 2026-09-24 TP4302-TP218 / TP215-TP4315 16 984.43 984.43 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP210 / TP209 19 753.83 753.83 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP4302-TP216 / TP1861-TP6488 19 1438.13 1438.13 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP4304-TP216 / TP1861-TP6488 19 1438.13 1438.13 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP4302-TP216 / TP1859-TP6488 19 1438.13 1438.13 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1933 / TP1930-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1935 / TP1922-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP204 / TP1924-TP211 14 945.03 945.03 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP202 / TP1924-TP211 14 945.03 945.03 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP204 / TP1920-TP211 14 945.03 945.03 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP202 / TP1920-TP211 14 945.03 945.03 0 0 tie
JFK LIS 2026-08-25 2026-09-08 TP4304-TP216 / TP215-TP4315 14 1102.43 1102.43 0 0 tie
JFK LIS 2026-08-25 2026-09-08 TP4302-TP218 / TP215-TP4315 14 1102.43 1102.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP202 / TP201 16 698.83 698.83 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1933 / TP203 16 714.23 714.23 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1931 / TP1930-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1931 / TP1928-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1933 / TP1930-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1935 / TP1930-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1931 / TP1924-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1931 / TP1922-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP202 / TP1928-TP211 16 780.03 780.03 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1935 / TP1920-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP202 / TP1924-TP211 16 780.03 780.03 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP8514-TP216 / TP1924-TP211 16 1002.53 1002.53 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP202 / TP1920-TP211 16 780.03 780.03 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP8514-TP216 / TP1920-TP211 16 1002.53 1002.53 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP8514-TP216 / TP201 16 921.33 921.33 0 0 tie
JFK LIS 2026-10-06 2026-10-27 TP210 / TP209 21 627.83 627.83 0 0 tie
JFK LIS 2026-10-06 2026-10-27 TP4302-TP216 / TP209 21 773.33 773.33 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP201 21 627.83 627.83 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP203 21 627.83 627.83 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP201 21 684.23 684.23 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP203 21 684.23 684.23 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP201 21 684.23 684.23 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP203 21 684.23 684.23 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP1928-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP203 21 684.23 684.23 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP1926-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP1924-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP1926-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP1922-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP1928-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP1920-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP1928-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP3960-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP1926-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP1924-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP1922-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP3960-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP1920-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP3960-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP1920-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP1928-TP211 21 972.53 972.53 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP1920-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP1924-TP211 21 972.53 972.53 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP1920-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP1922-TP211 21 972.53 972.53 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP201 21 891.33 891.33 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1931 / TP1920-TP211 19 785.43 785.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1933 / TP1922-TP211 19 785.43 785.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP202 / TP201 19 947.83 947.83 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1935 / TP1928-TP211 19 820.43 820.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1931 / TP1924-TP211 19 820.43 820.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1933 / TP1924-TP211 19 820.43 820.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1935 / TP1924-TP211 19 820.43 820.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP8514-TP216 / TP1928-TP211 19 1794.53 1794.53 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP204 / TP1922-TP211 19 840.03 840.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP202 / TP1920-TP211 19 840.03 840.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP202 / TP1928-TP211 19 875.03 875.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP204 / TP1924-TP211 19 875.03 875.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP202 / TP1924-TP211 19 875.03 875.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1931 / TP201 19 893.23 893.23 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1933 / TP201 19 893.23 893.23 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1935 / TP203 19 893.23 893.23 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1935 / TP201 19 893.23 893.23 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP218 / TP217 14 788.83 788.83 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP4315-TP210 / TP217 14 823.33 823.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP4315-TP210 / TP215 14 858.33 858.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP8513-TP204 / TP217 14 941.33 941.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP8513-TP204 / TP215 14 976.33 976.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP8515-TP204 / TP215 14 976.33 976.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP6474-TP1864 / TP215 14 1209.33 1209.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP6474-TP1864 / TP217 14 1209.33 1209.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP218 / TP209-TP4468 14 1421.93 1421.93 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP6474-TP1860 / TP217 14 2762.33 2762.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP6474-TP1860 / TP209-TP4468 14 3172.43 3172.43 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP218 / TP215 16 783.83 783.83 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP4313-TP210 / TP215 16 853.33 853.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8515-TP204 / TP209-TP4468 16 1081.43 1081.43 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8515-TP204 / TP217 16 971.33 971.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8513-TP204 / TP215 16 971.33 971.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP218 / TP1865-TP6505 16 1198.63 1198.63 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP6474-TP1860 / TP217 16 1209.33 1209.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP6474-TP1864 / TP215 16 1209.33 1209.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP6474-TP1864 / TP217 16 1209.33 1209.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP4313-TP210 / TP1863-TP6505 16 1303.13 1303.13 0 0 tie
JFK LIS 2026-09-08 2026-09-24 TP210 / TP209 16 698.83 698.83 0 0 tie
JFK LIS 2026-09-08 2026-09-24 TP4304-TP216 / TP209 16 803.33 803.33 0 0 tie
JFK LIS 2026-09-08 2026-09-24 TP4302-TP218 / TP209 16 803.33 803.33 0 0 tie
JFK LIS 2026-09-08 2026-09-24 TP210 / TP215-TP4315 16 879.93 879.93 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP4302-TP216 / TP209 19 899.33 899.33 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP4304-TP216 / TP209 19 899.33 899.33 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP4304-TP216 / TP1859-TP6488 19 1438.13 1438.13 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP210 / TP1861-TP6488 19 1333.63 1333.63 0 0 tie
JFK LIS 2026-09-22 2026-10-11 TP210 / TP1859-TP6488 19 1333.63 1333.63 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1931 / TP1930-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1931 / TP1924-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1931 / TP1922-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1931 / TP1920-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1935 / TP1930-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1933 / TP1924-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1933 / TP1922-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1935 / TP1924-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1933 / TP1920-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP212-TP1935 / TP1920-TP211 14 960.43 960.43 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP8514-TP216 / TP1930-TP211 14 1167.53 1167.53 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP8514-TP216 / TP1924-TP211 14 1167.53 1167.53 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP8514-TP216 / TP1922-TP211 14 1167.53 1167.53 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP8514-TP216 / TP1920-TP211 14 1167.53 1167.53 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP204 / TP1930-TP211 14 945.03 945.03 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP202 / TP1930-TP211 14 945.03 945.03 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP204 / TP1922-TP211 14 945.03 945.03 0 0 tie
EWR LIS 2026-08-25 2026-09-08 TP202 / TP1922-TP211 14 945.03 945.03 0 0 tie
JFK LIS 2026-08-25 2026-09-08 TP210 / TP215-TP4315 14 997.93 997.93 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP202 / TP203 16 698.83 698.83 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1931 / TP203 16 714.23 714.23 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1931 / TP201 16 714.23 714.23 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1933 / TP201 16 714.23 714.23 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1935 / TP203 16 714.23 714.23 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1935 / TP201 16 714.23 714.23 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1933 / TP1928-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1935 / TP1928-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1931 / TP1920-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1933 / TP1924-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1933 / TP1922-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP202 / TP1930-TP211 16 780.03 780.03 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1935 / TP1924-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1933 / TP1920-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP212-TP1935 / TP1922-TP211 16 795.43 795.43 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP8514-TP216 / TP1930-TP211 16 1002.53 1002.53 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP8514-TP216 / TP1928-TP211 16 1002.53 1002.53 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP202 / TP1922-TP211 16 780.03 780.03 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP8514-TP216 / TP1922-TP211 16 1002.53 1002.53 0 0 tie
EWR LIS 2026-09-08 2026-09-24 TP8514-TP216 / TP203 16 921.33 921.33 0 0 tie
JFK LIS 2026-10-06 2026-10-27 TP4304-TP216 / TP209 21 773.33 773.33 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP201 21 627.83 627.83 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP203 21 627.83 627.83 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP201 21 684.23 684.23 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP1928-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP1928-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1931 / TP3960-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP1926-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP1924-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP1926-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1933 / TP1922-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP1924-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP1924-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP212-TP1935 / TP3960-TP211 21 765.43 765.43 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP204 / TP1922-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP202 / TP1922-TP211 21 709.03 709.03 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP1926-TP211 21 972.53 972.53 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP3960-TP211 21 972.53 972.53 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP1920-TP211 21 972.53 972.53 0 0 tie
EWR LIS 2026-10-06 2026-10-27 TP8514-TP216 / TP203 21 891.33 891.33 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1931 / TP1922-TP211 19 785.43 785.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP204 / TP203 19 947.83 947.83 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP202 / TP203 19 947.83 947.83 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP204 / TP201 19 947.83 947.83 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1933 / TP1920-TP211 19 785.43 785.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1935 / TP1922-TP211 19 785.43 785.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1935 / TP1920-TP211 19 785.43 785.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1931 / TP1928-TP211 19 820.43 820.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1933 / TP1928-TP211 19 820.43 820.43 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP204 / TP1920-TP211 19 840.03 840.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP202 / TP1922-TP211 19 840.03 840.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP204 / TP1928-TP211 19 875.03 875.03 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1931 / TP203 19 893.23 893.23 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP212-TP1933 / TP203 19 893.23 893.23 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP8514-TP216 / TP203 19 1867.33 1867.33 0 0 tie
EWR LIS 2026-09-22 2026-10-11 TP8514-TP216 / TP201 19 1867.33 1867.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP216 / TP217 14 718.83 718.83 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP218 / TP215 14 823.83 823.83 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP216 / TP215 14 753.83 753.83 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP4313-TP210 / TP217 14 823.33 823.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP4313-TP210 / TP215 14 858.33 858.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP8515-TP204 / TP217 14 941.33 941.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP218 / TP201-TP8514 14 1561.93 1561.93 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP4315-TP210 / TP201-TP8514 14 1596.43 1596.43 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP6474-TP1864 / TP209-TP4468 14 1652.43 1652.43 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP6474-TP1860 / TP215 14 2762.33 2762.33 0 0 tie
BOS LIS 2026-08-25 2026-09-08 TP6474-TP1860 / TP201-TP8514 14 3172.43 3172.43 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP216 / TP215 16 748.83 748.83 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP216 / TP217 16 748.83 748.83 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP218 / TP217 16 783.83 783.83 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP4313-TP210 / TP209-TP4468 16 963.43 963.43 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP4313-TP210 / TP217 16 853.33 853.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP216 / TP209-TP4468 16 858.93 858.93 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP218 / TP209-TP4468 16 893.93 893.93 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8513-TP204 / TP209-TP4468 16 1081.43 1081.43 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8515-TP204 / TP215 16 971.33 971.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8513-TP204 / TP217 16 971.33 971.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP218 / TP1859-TP6510 16 1198.63 1198.63 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP216 / TP1859-TP6510 16 1198.63 1198.63 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP216 / TP1865-TP6505 16 1198.63 1198.63 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP218 / TP1863-TP6505 16 1198.63 1198.63 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP216 / TP1863-TP6505 16 1198.63 1198.63 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP4313-TP210 / TP1859-TP6510 16 1303.13 1303.13 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP6474-TP1860 / TP215 16 1209.33 1209.33 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP4313-TP210 / TP1865-TP6505 16 1303.13 1303.13 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP6474-TP1860 / TP209-TP4468 16 1319.43 1319.43 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8515-TP204 / TP1865-TP6505 16 1346.13 1346.13 0 0 tie
BOS LIS 2026-09-08 2026-09-24 TP8513-TP204 / TP1865-TP6505 16 1346.13 1346.13 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP218 / TP217 19 813.83 813.83 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP216 / TP217 19 813.83 813.83 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP4313-TP210 / TP1920-TP227 19 928.53 928.53 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP218 / TP1922-TP227 19 824.03 824.03 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP216 / TP1922-TP227 19 824.03 824.03 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP218 / TP1920-TP227 19 824.03 824.03 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP4313-TP210 / TP217 19 918.33 918.33 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP4313-TP210 / TP215 19 953.33 953.33 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP6474-TP1860 / TP217 19 1229.33 1229.33 0 0 tie
BOS LIS 2026-09-22 2026-10-11 TP6474-TP1864 / TP217 19 1229.33 1229.33 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP216 / TP217 21 793.83 793.83 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP218 / TP1930-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4313-TP210 / TP1930-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP216 / TP1930-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4313-TP210 / TP1928-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4313-TP210 / TP1926-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP218 / TP1926-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4315-TP210 / TP1928-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4313-TP210 / TP1924-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP218 / TP1924-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4315-TP210 / TP1926-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP218 / TP3960-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP216 / TP3960-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4315-TP210 / TP1924-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP218 / TP1922-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP218 / TP1920-TP227 21 804.03 804.03 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4315-TP210 / TP1922-TP227 21 908.53 908.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4315-TP210 / TP217 21 898.33 898.33 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4313-TP210 / TP201-TP8510 21 1126.43 1126.43 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP6474-TP1860 / TP201-TP8510 21 1362.43 1362.43 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP6474-TP1864 / TP201-TP8510 21 1362.43 1362.43 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP4315-TP210 / TP1823-TP6527 21 1469.33 1469.33 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP8513-TP204 / TP1930-TP227 21 2161.53 2161.53 0 0 tie
BOS LIS 2026-10-06 2026-10-27 TP8513-TP204 / TP1926-TP227 21 2161.53 2161.53 0 0 tie
IAD LIS 2026-09-08 2026-09-24 TP234 / TP233 16 888.83 888.83 0 0 tie
IAD LIS 2026-09-08 2026-09-24 TP234 / TP231 16 888.83 888.83 0 0 tie
IAD LIS 2026-09-08 2026-09-24 TP8505-TP202 / TP201-TP8504 16 1629.43 1629.43 0 0 tie
IAD LIS 2026-09-08 2026-09-24 TP232 / TP201-TP8504 16 1327.93 1327.93 0 0 tie
IAD LIS 2026-09-08 2026-09-24 TP8505-TP202 / TP1930-TP211-TP8498 16 1910.13 1910.13 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP232 / TP233 14 989.83 989.83 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP234 / TP231 14 989.83 989.83 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP232 / TP231 14 989.83 989.83 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP8505-TP202 / TP231 14 1292.33 1292.33 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP234 / TP1930-TP211-TP8498 14 1665.13 1665.13 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP232 / TP1930-TP211-TP8498 14 1665.13 1665.13 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP234 / TP1928-TP211-TP8498 14 1783.13 1783.13 0 0 tie
IAD LIS 2026-08-25 2026-09-08 TP232 / TP1928-TP211-TP8498 14 1783.13 1783.13 0 0 tie
IAD LIS 2026-09-22 2026-10-11 TP232 / TP233 19 953.83 953.83 0 0 tie

Showing the first 300 of 1489 rows — download this table as CSV

â–¶ NDC vs Amadeus per trip (cheapest to cheapest) 40 trip Two-way ledger per trip: cheapest Amadeus vs cheapest NDC, signed delta. The two sides may be different itineraries
origindestinationdeparture_datereturn_datenightsamadeus_netndc_netdeltapct_diffcheaper
EWR FNC 2026-08-25 2026-09-08 14 939.03 1059.73 -120.7 -11.4 amadeus
EWR FNC 2026-09-22 2026-10-11 19 695.53 721.73 -26.2 -3.6 amadeus
JFK LIS 2026-09-08 2026-09-24 16 698.83 698.83 0 0 tie
JFK LIS 2026-09-22 2026-10-11 19 753.83 753.83 0 0 tie
EWR LIS 2026-09-08 2026-09-24 16 698.83 698.83 0 0 tie
EWR LIS 2026-10-06 2026-10-27 21 627.83 627.83 0 0 tie
JFK LIS 2026-10-06 2026-10-27 21 627.83 627.83 0 0 tie
BOS LIS 2026-09-08 2026-09-24 16 748.83 748.83 0 0 tie
BOS LIS 2026-09-22 2026-10-11 19 813.83 813.83 0 0 tie
IAD LIS 2026-09-08 2026-09-24 16 888.83 888.83 0 0 tie
MIA LIS 2026-08-25 2026-09-08 14 934.83 934.83 0 0 tie
MIA LIS 2026-09-22 2026-10-11 19 651.83 651.83 0 0 tie
MIA LIS 2026-10-06 2026-10-27 21 626.83 626.83 0 0 tie
JFK OPO 2026-09-22 2026-10-11 19 741.63 741.63 0 0 tie
JFK OPO 2026-09-08 2026-09-24 16 812.63 812.63 0 0 tie
EWR FNC 2026-09-08 2026-09-24 16 683.73 683.73 0 0 tie
BOS PDL 2026-09-08 2026-09-24 16 686.23 686.23 0 0 tie
BOS PDL 2026-10-06 2026-10-27 21 731.23 731.23 0 0 tie
IAD OPO 2026-08-25 2026-09-08 14 772.63 772.63 0 0 tie
SFO OPO 2026-09-08 2026-09-24 16 854.83 854.83 0 0 tie
EWR LIS 2026-09-22 2026-10-11 19 785.43 785.43 0 0 tie
BOS LIS 2026-08-25 2026-09-08 14 718.83 718.83 0 0 tie
BOS LIS 2026-10-06 2026-10-27 21 793.83 793.83 0 0 tie
IAD LIS 2026-08-25 2026-09-08 14 989.83 989.83 0 0 tie
IAD LIS 2026-09-22 2026-10-11 19 953.83 953.83 0 0 tie
MIA LIS 2026-09-08 2026-09-24 16 755.83 755.83 0 0 tie
IAD LIS 2026-10-06 2026-10-27 21 757.83 757.83 0 0 tie
JFK OPO 2026-10-06 2026-10-27 21 741.63 741.63 0 0 tie
EWR FNC 2026-10-06 2026-10-27 21 653.73 653.73 0 0 tie
BOS PDL 2026-09-22 2026-10-11 19 751.23 751.23 0 0 tie
IAD OPO 2026-09-08 2026-09-24 16 745.63 745.63 0 0 tie
IAD OPO 2026-09-22 2026-10-11 19 688.63 688.63 0 0 tie
IAD OPO 2026-10-06 2026-10-27 21 688.63 688.63 0 0 tie
SFO OPO 2026-08-25 2026-09-08 14 909.83 909.83 0 0 tie
SFO OPO 2026-09-22 2026-10-11 19 938.63 938.63 0 0 tie
SFO OPO 2026-10-06 2026-10-27 21 818.63 818.63 0 0 tie
JFK LIS 2026-08-25 2026-09-08 14 997.93 986.83 11.1 1.1 ndc
BOS PDL 2026-08-25 2026-09-08 14 729.23 663.33 65.9 9.9 ndc
EWR LIS 2026-08-25 2026-09-08 14 945.03 850.03 95 11.2 ndc
JFK OPO 2026-08-25 2026-09-08 14 1038.63 883.63 155 17.5 ndc

download this table as CSV

▶ Trips where Amadeus was cheapest 2 trip Trips where cheapest Amadeus < cheapest NDC. Coarser than why-amadeus — the two sides may be different itineraries
origindestinationdeparture_datereturn_datenightsamadeus_netndc_netdeltapct_diff
EWR FNC 2026-08-25 2026-09-08 14 939.03 1059.73 -120.7 -11.4
EWR FNC 2026-09-22 2026-10-11 19 695.53 721.73 -26.2 -3.6

download this table as CSV

â–¶ Route overview: who wins where 10 route Per-route two-way overview: how many itineraries Amadeus vs NDC wins, and the biggest gap each way (computed per exact itinerary, so no nights-mixing)
origindestinationtripsamadeus_winsndc_winstiesbest_amadeus_deltabest_ndc_delta
EWR FNC 4 2 0 2 -120.7 —
JFK LIS 4 0 1 3 — 11.1
BOS LIS 4 0 0 4 — —
IAD LIS 4 0 0 4 — —
EWR LIS 4 0 1 3 — 95
BOS PDL 4 0 1 3 — 65.9
SFO OPO 4 0 0 4 — —
MIA LIS 4 0 0 4 — —
JFK OPO 4 0 1 3 — 155
IAD OPO 4 0 0 4 — —

download this table as CSV

Offer summary by source

Total offers by source and fare type

sourcefare_typeoffer_countmin_netavg_netmedian_netroutes
amadeus nego 2640 783.73 1007.61 967.63 10
amadeus published 12102 626.83 1301.4 1189.96 10
ndc_direct nego 961 820.23 1776.08 1590.93 9
ndc_direct published 5028 626.83 1513.49 1290.71 10

download this table as CSV

Searches where a source returned nothingsearch

Routes/dates where one source returned zero offers (ndc_missing shown first)

Both sources returned at least one offer for every search.

Download raw data (parquet)